Identify all steel work in the plant that has corroded to the point that its structural integrity will fail. A category system was drafted and followed to show the order in when the steel would be replaced.
- R38 million
- 12 months
- Louis de Kock
Identify all steel work in the plant that has corroded to the point that its structural integrity will fail. A category system was drafted and followed to show the order in when the steel would be replaced.